Apache Floating Deck Wharf

Client: Apache Oil and Gas

Floating deck wharf facility in the Dampier Port, consisting of the deck barge restrained between 4 no. dolphins located in each corner fore and aft.

  • Installation of 4 no. Restraint Dolphins and 2 levels of bracing jackets. Each dolphin consisting of 4 no. tubular piles with 20m penetration into the bed. 
  • Drilling pile anchor pins with pile top rigs, installation of pins and grouting of socket
  • Access ramp abutment construction
  • Barge fit out and ballasting
  • Wharf strongpoint modifications
  • Demolition of existing mooring dolphin
  • Diving Operations

More Projects

Menu