Fulham FC New Riverside Stand

Client: Buckingham Group Contracting Ltd

A new riverside stand is currently under construction at Fulham Football Club. The riverside walk, marine piling, steel frame, precast elements, roof and envelope packages are all being installed by crane barges in the river

MACS are employed on the project by Buckingham Group as the Marine Works Project Manager. Currently on site there is 1 no. 600T Jack Up Barge, 1 no. 100T Jack Up Barge, 2 no. crane barges and 4 no. dumb barges supplying materials from our offsite facilities. As well as a number of support vessels including guard boat, safety boat, tugs and multicats. We also hold the roles for Lifting Operations Appointed Person and Temporary Works Coordinator for the project.

Keep up to date with the latest news from the project here:

Our scope of works included:
  • New river wall: combiwall tube (composite steel and concrete) and sheet piles
  • Marine tubular bearing piles (composite steel and concrete)
  • Marine deck: precast and in-situ
  • Steel frame installation
  • Bulk excavation and muck away via river
  • Marine furniture and fendering
  • Marine logistics
  • Temporary barge berth design and installation
  • Installation of roof truss sections via crane barge
  • Marine Plant: 4 no. Jack Up Barges, 3 no. floating crane barges, hopper barges, excavator barges, support vessels

More Projects